02.10.13 Blasting Building & Paint Shop

16.09.13 Concrete Floor Fabrication Shop

09.09.13 Stores Blockwork

09.09.13 Blasting Shed Steelwork

12.08.13 Installation of Overhead Cranes

15.07.13 First of the Steel Cladding

09.07.13 First from the Inside

01.07.13 Entrance Steel Work

03.06.13 Starting to show the size

30.05.13 Making a start on the steel

SeaQuest Site Progression

SeaQuest Site Progression